Service Panel Upgrade – Final Inspection

Final Inspection of your service panel upgrade…

Now that the rough-in inspection has been signed off, you’re ready to prepare for the “Final Inspection” of your service panel upgrade. The contractor will check and confirm grounding and bonding required is in place, proper voltage is present at feeder wires and all circuits at the line and load contacts, we also check and confirm continuity at all contacts and common busbars then identify and label panel board. Once these steps are completed and confirmed,  the Utility Inspector at 714.765.6847 will be contacted to verify that the installation is up to NEC code, safe to restore power to the panel and sign off on the Final Inspection…